Lee Whiteaker Plumbing

Bathroom Remodel Plumbing

Bathroom Remodel Plumbing in Georgetown, TX. Free, no-pressure estimates.

4.9 stars on Google

From 38 verified customer reviews.

Local, and close by

Covering Georgetown, TX and the surrounding area.

Free estimates

Tell us what needs doing and we will come out and take a look.

The work

About our bathroom remodel plumbing

A bathroom remodel often starts with a homeowner wanting a new layout—moving a toilet, adding a double vanity, or converting a tub to a shower. You call a plumber because the walls are open and the floor is up, and the old pipes need to be rerouted to match the new plan. The situation is messy, the timeline is tight, and the plumbing has to be right before the tile and drywall go in.

We start by shutting off the water and draining the lines. Then we cut into the existing copper or PEX supply lines and ABS or PVC drain pipes to reroute them to the new fixture locations. We install new shutoff valves, trap arms, and vent connections, then pressure-test the system. After the rough-in passes inspection, we set the tub, toilet flange, and sink drain, and connect the trim once the walls are finished.

Every job differs based on how far fixtures move from the existing stack. Moving a toilet across the room means cutting into the slab or joists, which adds time. Access matters too—crawlspaces and attics are easier than concrete slabs. The condition of old galvanized pipe can force a full repipe. Fixture type also changes the work: a freestanding tub needs a floor-mounted faucet and a dedicated drain, while a curbless shower requires a linear drain and a sloped subfloor.

On the day of work, we lay down drop cloths and runner boards to protect your floors. We cut drywall only where necessary and patch it cleanly. Each evening we sweep, bag debris, and haul it out. Before we arrive, clear the area of furniture and personal items. After we finish, you’ll need to schedule the drywall and tile work around the rough-in, and we’ll return to set the fixtures once the walls are painted.

After the rough-in is approved, we come back to install the faucets, showerheads, toilet, and sink. We check every connection for leaks under pressure and verify the hot-cold alignment. We also flush the lines to clear any debris. You’ll be left with a fully functional bathroom, and we’ll walk you through the shutoff locations and any maintenance tips for the new fixtures.

Rough-in vs. Trim

Rough-in is the behind-the-wall pipework before tile and drywall. Trim is the final fixture installation. Skipping proper rough-in inspection leads to leaks behind finished walls.

Vent Stack Routing

Every drain needs a vent to prevent siphoning traps. Relocating a toilet often requires tying into the existing vent stack or adding an AAV (air admittance valve) under the sink.

How we work

  • Same crew from quote to clean-up
  • We bring everything in the truck
  • Floor protection on every job
  • We haul off the old materials
  • One number, same people answering
  • We come back if something is off
Bathroom Remodel Plumbing
Lee Whiteaker Plumbing

Get a Free Quote

By submitting, you agree to our Privacy Policy and Terms & Conditions.

Our work

See the Transformation

Drag the handle to see the difference.

After the workBefore the workBeforeAfter
How the job runs

Our 4-step bathroom remodel plumbing process

01

Site Assessment

We visit your home to see the existing plumbing layout, measure fixture locations, and check access to the crawlspace, attic, or slab. We note the pipe material and condition.

02

Rough-In Plumbing

We cut and reroute supply lines and drain-waste-vent pipes to the new fixture locations. We install shutoff valves, toilet flanges, and shower valve bodies, then pressure-test the system.

03

Inspection & Drywall

We schedule the rough-in inspection with your local building department. Once approved, the drywall and tile crew can close the walls. We mark the pipe locations for reference.

04

Final Fixture Install

After the walls are finished, we return to set the toilet, connect the sink and faucet, install the shower trim and tub spout, and verify all connections for leaks and proper flow.

Bathroom Remodel Plumbing, Lee Whiteaker Plumbing
The difference

Why Lee Whiteaker Plumbing for bathroom remodel plumbing

  • Correct Venting

    Every drain line must be vented to prevent sewer gas from entering the home and to keep water flowing smoothly. We calculate the right vent size and route it to the existing stack or install an AAV where needed.

  • Slope & Pitch

    Drain pipes must slope ¼ inch per foot toward the main stack. We use a laser level to check every run. Too flat or too steep, and solids settle, causing clogs down the line.

  • Pressure Testing

    Before the walls are closed, we pressurize the supply lines to 80 psi and hold it for 30 minutes. A drop of even 2 psi means a leak we find and fix before the tile goes up.

Questions

Bathroom Remodel Plumbing FAQs

Get in Touch with Lee Whiteaker Plumbing

Ready to fix that leak, replace your water heater, or start a bathroom remodel? Give us a call or send a message and we'll get back to you quickly.

CallFree estimate